Evaluation of Vertica Retaining Wall Systems
Prepared by the Highway Innovative Technology Evaluation Center (HITEC). This report describes a HITEC evaluation designed to determine the basic capabilities...

Very Long-Term Care of Mechanically Stabilized Earth Berms: Limiting the Liability of Future Stakeholders
Since their development over 50 years ago, civil engineering applications of mechanically stabilized earth (MSE) berms have significantly increased. When used as a component of an asset...

Geosynthetic Materials Help Build Optimized Infrastructure
In recent years, the world has begun to realize the negative impacts that limited infrastructure can have on economic growth and the well-being of humankind. Our infrastructure challenges...

Introduction
Many institutions and private industry organizations have prepared guidance documents with the latest scientific and engineering information on proper design, installation, maintenance,...

Design Considerations Common To All Permeable Pavements
Impervious cover in watersheds without controls result in increased stormwater runoff and decreased groundwater recharge in response to rainfall events. This increased runoff can be the...

Porous Asphalt and Permeable Friction Course Overlays
Porous asphalt typically consists of conventional warm mix asphalt (WMA) or hot mix asphalt (HMA) with significantly reduced fines resulting in an open-graded mixture that allows water...

Pervious Concrete
Pervious concrete consists of a hydraulic cementitious binding system combined with an open-graded aggregate to produce a rigid pavement with typically 15% to 25% interconnected void space....

Permeable Interlocking Concrete Pavement (PICP)
Permeable interlocking concrete pavement (PICP) consists of (impervious) manufactured concrete units that form permeable voids and joints, when assembled into a laying pattern. The openings...

Achieving Success and Avoiding Failures with Permeable Pavements
This chapter provides experienced-based recommendations on how to achieve success with permeable pavements. This information is based on an informational survey completed by designers,...

Maintenance
While site selection and proper construction are the most critical factors in establishing that permeable pavements function as designed, all must be inspected and maintained to maximize...

Hydrologic and Hydraulic Design Methods
Computational methods for hydrologic analysis, hydraulic functions, and treatment capacity of permeable pavements vary depending on the complexity of the design and level of detail in...

Permeable Pavement Research Needs
The implementation of permeable pavement installations and practices are expanding and becoming more commonplace. With this increased usage comes expanded and improved information on design,...

Loading, Geometry, and Analysis
This Standard applies to latticed steel transmission structures. These structures shall be either self-supporting or guyed. They consist of hot-rolled or cold-formed prismatic members...

Design of Connections
Bolted connections for transmission structures are normally designed as bearing type connections. It is assumed that bolts connecting one member to another carry the load in the connection...

Structural Members and Connections Used in Foundations
This chapter specifies design procedures for steel members and connections embedded in concrete foundations or the earth. Additional design requirements for structural members and connections...

Detailed Site Investigations
This section addresses site investigation issues that are important for detailed design and construction of microtunneling projects. These site investigations include the following: Geotechnical...

Pipe Characteristics
Microtunneling pipe should meet the following general requirements: Circular shape with a flush outside surface (including at the joints); Strength sufficient to withstand both the installation...

Pipe Design
The pipes and joints, once installed, must be capable of safely withstanding, for the project design life, all in-use service loads, including those associated with the following factors:...

Notes on Heavy Lift Design
The interrelated activities and responsibilities of the various organizations involved in the lift design and offshore installation of topside facilities for an offshore platform are discussed....

Findings From a Joint Industry Study on Foundation Fixity of Jackup Units
During the design storm conditions the soil supporting jack-up unit footings may be close to, or at plastic failure. Accordingly, the use of elastic solutions to the problems of foundation...

 

 

 

 

Return to search